davidmatthewson
Posts: 3
Joined: 17.Aug.2009
Status: offline
|
Hi If I run a scheduled job by hand then the manual run time changes to be, say, 24 hrs, after this time and not as originally scheduled. (Which was, say, 0300hrs every day) This is not a good thing, as I might want the scan to run at night but do a 'one off' during the day. How can I get the scheduled times to 'stick'? Thanks David Version: 9.0 Build: 20090709
|